When was Rainbow Bridge filmed?

When was Rainbow Bridge filmed?

1971
Rainbow Bridge (film)

Rainbow Bridge
Music by Jimi Hendrix
Production company Antahkarana Productions
Distributed by Transvue Pictures Alcyone Releasing
Release date 1971 (Aquarius Theatre, Hollywood)

Where was Jimi Hendrix Maui concert?

Live in Maui
Recorded July 30, 1970
Venue Upcountry Maui, Hawaii
Genre Rock
Length 100:18

What album was Pali Gap on?

Rainbow Bridge
Pali Gap/Album

Who wrote Pali Gap?

Jimi Hendrix
Pali Gap/Composers

Where was Rainbow Bridge filmed?

Maui
Rainbow Bridge was an Easy Rider-inspired film produced by Hendrix’s manager Michael Jeffery and filmed on the Hawaiian island of Maui.

Where is Pali Gap?

The Pali Gap Coast is an isolated cavern found north of Undvik and west of Kaer Almhult.

Who played with Jimi Hendrix in Maui?

Also included in the package is Live In Maui – a 2 CD set or 3 LP set featuring Hendrix, Billy Cox, and Mitch Mitchell at the height of their playing powers, newly restored and mixed by longtime Hendrix engineer Eddie Kramer.

When was Jimi Hendrix in Maui?

This year marks the 50th anniversary of the release of the film “Rainbow Bridge.” Shot on Maui in 1971 with amateur actors and without a script, the film centered on the late 1960s counterculture on the island. It also included a live performance by rock legend Jimi Hendrix on July 30, 1970.

What key is Pali Gap?

Pali Gap is written in the key of A♯m.

What key is Pali Gap in?

When does the movie Rainbow Bridge come out?

A documentary film, titled Music, Money, Madness Jimi Hendrix in Maui, about the making of Rainbow Bridge was released on November 20, 2020. It was accompanied by an album, Live in Maui, reported to include all of Hendrix’s performances recorded during the filming.

When was the last Rainbow Bridge album released?

Rainbow Bridge was an experimental/noise/avant label originally from Baltimore, MD, then Chicago, IL. It was run by Angel Marcloid (formerly Justin Marc Lloyd) and primarily released cassettes and CDrs. It ceased operations after it’s last release in January 2015.

When did Rainbow Bridge go out of business?

It was run by Angel Marcloid (formerly Justin Marc Lloyd) and primarily released cassettes and CDrs. It ceased operations after it’s last release in January 2015. It was originally planned to be a hiatus, but it was decided in 2017 that the label would no longer continue.

When is Rainbow Bridge Remembrance Day in 2020?

Rainbow Bridge Remembrance Day – August 28, 2021 Sat Aug 28